Trial Run of Indian Oil Corporation Ltd.’s Asanur Terminal to Begin In a Month
08.23.2022 By Ella Keskin - NEWS

August 23, 2022 [ The Hindu ] – It will supply fuel to Villupuram, Cuddalore, Perambalur and Puducherry

 

The trial run for Indian Oil Corporation Ltd.’s (IOCL) Asanur terminal in Kallakuruchi will commence in a month. “We will move petroleum products for the trial shortly and hope to finish obtaining the remaining approvals soon. The project is expected to be commissioned by the end of the year,” V.C. Asokan, Executive Director, IOCL, told The Hindu.

The foundation stone for the ₹470-crore project, which will ease the pressure on the company’s other terminals, was laid in November 2020. The new terminal would supply fuel to Villupuram, Cuddalore, Perambalur and Puducherry, Mr. Asokan said.

The Asanur terminal has come up near the existing booster station for the Chennai–Tiruchi–Madurai Pipeline (CTMPL) from where a line branches off to the Sankari terminal. A total of 75 acres of land belonging to SIDCO (Tamil Nadu Small Industries Development Corporation Limited) had been obtained for this terminal. This project was part of the ₹7,900 crore investments planned for the State. An Memorandum of Understanding had been signed for the same during the Global Investors’ Meet held in the city in 2019.

A 12” diameter branch pipeline of 700 metre long from the existing pumping station has been laid to the terminal. A shed with eight bays with truck loading and blending facilities and vapour recovery system have been constructed at the greenfield terminal, which will be able to handle and store finished petroleum products.

The total storage capacity of tanks at the terminal would be 83,009 KL, including 30,642 KL of petroleum and 44,817 KL of High Speed Diesel (HSD). Blended petroleum products – ethanol with petrol and biodiesel with diesel – would be distributed to various industries and retail outlets through tank trucks. On an average, 125-150 tank trucks are expected to be filled and sent out daily.

 


Pro Trial: Access 11,340 Tank Terminal and Production Facilities

11,340 tank storage and production facilities as per the date of this article. Click on the button and register to get instant access to actionable tank storage industry data

10-year Treasury yield hovers close to highest level since April as investors await key jobs data
01.10.2025 - NEWS
U.S. Treasury yields hovered close to its highest level since April on Friday, as investo... Read More
Union dockworkers, port employers announce tentative deal at East Coast and Gulf ports
01.09.2025 - NEWS
State of Freight The tentative agreement is on all items for a new six-year mas... Read More
China's property market is expected to stabilize in 2025 — but stay subdued for years
10.30.2024 - NEWS
China’s struggling real estate sector may not start turning around until the sec... Read More
Harris will offer an alternative to Trump-era politics in closing argument speech
10.29.2024 - NEWS
1234534234 Democratic presidential nominee U.S. Vice President Kamala Harris walks to bo... Read More