Enbridge to Build Tanks for Surmont Oil Sands Project
05.08.2013 - NEWS

May 08, 2013 [Reuters] - Enbridge Inc, Canada's largest pipeline operator, said on Tuesday it will spend C$300 million ($299 million) on infrastructure to handle expanded production from the Surmont oil sands project owned by ConocoPhillips and French oil major Total SA.


Enbridge will build two 450,000 barrel storage tanks to be used for blending tar-like bitumen with diluent so that it can flow on pipeline and convert an existing tank to store diluent.

It will also install the equipment needed to connect the Surmont project to Enbridge’s Waupisoo pipeline system, which carries oil sands crudes to Edmonton, Alberta. The work is expected to be complete by the first quarter of 2015.

Conoco and Total are expanding their Surmont joint venture to produce 136,000 barrels per day from its initial 27,000 bpd phase. The project, 60 kilometers (37 miles) south of Fort McMurray, Alberta, is scheduled to start up in 2015.

10-year Treasury yield hovers close to highest level since April as investors await key jobs data
01.10.2025 - NEWS
U.S. Treasury yields hovered close to its highest level since April on Friday, as investo... Read More
Union dockworkers, port employers announce tentative deal at East Coast and Gulf ports
01.09.2025 - NEWS
State of Freight The tentative agreement is on all items for a new six-year mas... Read More
China's property market is expected to stabilize in 2025 — but stay subdued for years
10.30.2024 - NEWS
China’s struggling real estate sector may not start turning around until the sec... Read More
Harris will offer an alternative to Trump-era politics in closing argument speech
10.29.2024 - NEWS
1234534234 Democratic presidential nominee U.S. Vice President Kamala Harris walks to bo... Read More