Estonia Begins Building LNG Terminal Infrastructure
06.11.2022 By Ricardo Perez - NEWS

June 11, 2022 [OIL&GAS Journal] – Estonian gas system operator Elering AS’s contractor, Connecto AS, has begun building the pipeline that will connect the planned floating 5-billion cu m/year (bcmy) Paldiski LNG terminal in Estonia to the regional Balticconnector natural gas network.

 

Estonian gas system operator Elering AS’s contractor, Connecto AS, has begun building the pipeline that will connect the planned floating 5-billion cu m/year (bcmy) Paldiski LNG terminal in Estonia to the regional Balticconnector natural gas network. Construction is divided into four major components:

Pipeline from landfall to the onshore compressor station.

• Subsea pipeline from the coast to the floating storage and regasification unit’s (FSRU) mooring quay.

• Equipment on the mooring quay.

• Connection between the quay and the FSRU.

The pipeline’s route has been marked and site preparation is underway. Directional drilling to between the terminal’s compression and the coast is expected to begin in July.

Elering has already acquired the project’s line pipe and stopcocks. Total length of the pipe between the compressor station and mooring quay is 1.2 km.

Estonia’s use of the FSRU is a temporary measure until a permanent terminal site can be built in Finland. Elering and Gasgrid Finland in May 2022 signed a cooperation agreement for the joint lease and management of the FSRU to ensure the security of gas supply to the two countries and to end the need for Russian pipeline gas consumption.

According to the cooperation agreement between Elering and Gasgrid, the parties each will develop the necessary infrastructure for the terminal and bear the related. But the FSRU rental costs are going to covered jointly in proportion with the Estonian and Finnish gas consumption, 20% and 80% respectively.

The FSRU will arrive in Estonia by end-2022 and remain there until work at the Finnish site is completed. Once the FSRU is stationed in Finland, Estonia will have two potential gas supply directions, Balticconnector and the FSRU in the north, and Latvian underground gas storage, the 3.7-bcmy Klaipeda LNG terminal and Polish-Lithuanian gas connector in the south.

Pro Trial: Access 10,390 Tank Terminal and Production Facilities

10,390 tank storage and production facilities as per the date of this article. Click on the button and register to get instant access to actionable tank storage industry data

10-year Treasury yield hovers close to highest level since April as investors await key jobs data
01.10.2025 - NEWS
U.S. Treasury yields hovered close to its highest level since April on Friday, as investo... Read More
Union dockworkers, port employers announce tentative deal at East Coast and Gulf ports
01.09.2025 - NEWS
State of Freight The tentative agreement is on all items for a new six-year mas... Read More
China's property market is expected to stabilize in 2025 — but stay subdued for years
10.30.2024 - NEWS
China’s struggling real estate sector may not start turning around until the sec... Read More
Harris will offer an alternative to Trump-era politics in closing argument speech
10.29.2024 - NEWS
1234534234 Democratic presidential nominee U.S. Vice President Kamala Harris walks to bo... Read More