LNG Alliance Is Bringing Affordable And Reliable LNG To The Landlocked Balkan Nations Through Montenegro's Bar LNG Terminal
10.25.2022 By Ella Keskin - NEWS

October 25, 2022 [LNG Alliance] – The Balkans is one of the world’s most diverse, complex, and cosmopolitan regions in south-eastern Europe. An energy crisis is looming in the Balkans in anticipation of the acute fuel shortages expected during the upcoming winter, while European Union leaders are scrambling to maintain their LNG and natural gas supplies.

 

Currently, there is no operating LNG terminal along the entire Adriatic coastline, almost 1,000 kilometres extending from the Greece-Albania border to the Krk Terminal in Croatia. The vast hinterland of the upcoming Bar LNG terminal in Montenegro will primarily serve Montenegro and major parts of Bosnia-Hercegovina, Kosovo, Serbia, Albania, and the southern region of Hungary. The Bar LNG terminal will bring regasified LNG through gas pipelines to Montenegro and can support the entire Balkans through virtual pipelines, i.e., the distribution of LNG through ISO LNG Containers loaded on to trucks and trains to consumers, such as industrial clusters, LNG/CNG fuel stations, and municipalities, who are in remote locations far from the pipelines.

The current energy crisis in Europe clearly demonstrates the necessity of alternatives to Russian gas. In that context, the Bar LNG terminal will play a crucial role as an LNG storage provider and as an LNG distributor to provide energy security to the entire region. With natural water depth that needs no dredging and excellent metocean conditions, a wide range of LNG ships will be able to deliver the most competitively priced LNG to the Bar LNG Terminal, resulting in an affordable and reliable LNG supply for all consumers in the Balkans. The Bar LNG Terminal is envisaged to play a vital role in assisting the revival of closed-down industries, fuelling the economies, and in establishing gas as a prominent transition fuel in the energy mix of the region.

In May 2022, LNG Alliance Pte Ltd completed the prefeasibility studies for the Bar LNG Terminal and signed a new MOU with the Port of Bar for further advanced studies for the FSU-based 0.4 MTPA import terminal, which can be modularly expanded to 1.2 MTPA with demand. The project FID for the Bar LNG Terminal is expected in Q3 2023. The terminal is designed to be “future proof” and includes features for usage of the same tanks and piping to handle green ammonia imports in the future.

 


Pro Trial: Access 11,340 Tank Terminal and Production Facilities

11,340 tank storage and production facilities as per the date of this article. Click on the button and register to get instant access to actionable tank storage industry data

10-year Treasury yield hovers close to highest level since April as investors await key jobs data
01.10.2025 - NEWS
U.S. Treasury yields hovered close to its highest level since April on Friday, as investo... Read More
Union dockworkers, port employers announce tentative deal at East Coast and Gulf ports
01.09.2025 - NEWS
State of Freight The tentative agreement is on all items for a new six-year mas... Read More
China's property market is expected to stabilize in 2025 — but stay subdued for years
10.30.2024 - NEWS
China’s struggling real estate sector may not start turning around until the sec... Read More
Harris will offer an alternative to Trump-era politics in closing argument speech
10.29.2024 - NEWS
1234534234 Democratic presidential nominee U.S. Vice President Kamala Harris walks to bo... Read More