New Oil Terminal for China’s Chaozhou Port
12.02.2013 - NEWS

December 2, 2013 [Port Technology International] - CCCC Second Harbor Engineering to build new 400 million yuan facility for transfer and storage of oil products


CCCC Second Harbor Engineering Co., Ltd. has agreed a contract with Yihua Petrochemical Co., Ltd. for the planning and design of a new oil terminal in the Chaozhou Port, China.

The terminal complex, requiring a total investment of approximately 400 million yuan, will be used for the storage and transfer of refined oil products including gasoline, diesel and aviation kerosene. It will include one 50,000t berth and a 2,000t berth across 296 metres of quay and will cover an area of 10,034 square metres. Boasting a total tank volume of 295,000 cubic metres the new terminal will have an annual handling capacity of three million tonnes.

CCCC will be responsible for its initial design, construction drawing design and geological surveys at corresponding stages.

10-year Treasury yield hovers close to highest level since April as investors await key jobs data
01.10.2025 - NEWS
U.S. Treasury yields hovered close to its highest level since April on Friday, as investo... Read More
Union dockworkers, port employers announce tentative deal at East Coast and Gulf ports
01.09.2025 - NEWS
State of Freight The tentative agreement is on all items for a new six-year mas... Read More
China's property market is expected to stabilize in 2025 — but stay subdued for years
10.30.2024 - NEWS
China’s struggling real estate sector may not start turning around until the sec... Read More
Harris will offer an alternative to Trump-era politics in closing argument speech
10.29.2024 - NEWS
1234534234 Democratic presidential nominee U.S. Vice President Kamala Harris walks to bo... Read More